Crane Mat Pad at Vancouver Terminal Part 2
The crane parts have arrived and are being assembled on the Crane Mat pad we supplied at the Terminal. It took 36 B trains to transport the Crawler Crane. They are only half way through assembling. This is a 2 layer pad built with...