Contoured Pipe Dunnage 36″ Diameter
This Pipe Dunnage is being used to load 36" OD pipe on trucks, 2 pieces of pipe on bottom of load, 1 piece of pipe centered on top of load. Dunnage is 6" x 6" x 96". This is the safest way to truck...
Have a question about our timber products, or want to know more about our processes?
Use the form below to submit your question. It will be promptly reviewed and answered by our technical team.
"*" indicates required fields
This Pipe Dunnage is being used to load 36" OD pipe on trucks, 2 pieces of pipe on bottom of load, 1 piece of pipe centered on top of load. Dunnage is 6" x 6" x 96". This is the safest way to truck...
These blocks were an interesting job! The blocks are designed to fit against a ship's side and each one has multiple angles, in other words a different thickness in each corner of the block. A multi-angle wedge which led to a bit of head...
We are building these Rail Crossing Kits for a customer, each "kit" comes with 5 middle pieces (between the rails) and 2 outside pieces (outside the rails). The pieces closest to the rails are bevelled to allow for the rail plates/nails to clear. This...
When our customer needed to demolish a large dock they needed to come up with a solution for dropping concrete waste onto a floating platform. Floating swamp mats was a quick and efficient answer. They float and they can take a lot of abuse....
Our customer used our Access Mats to bring in a thousand loads of structural fill to a site in Tsawwassen, BC. All the dump trucks ( transfer trucks) used this temporary roadway to avoid any damage to surrounding lands. Access Mats are 8' wide...
Sometimes you need a place to dock the work boat! We supplied 4' wide x 30' long x 12" thick Crane Mats for both a ramp and the floating dock. Quick job!
We supplied these Trestle Mats to create a temporary bridge beside the actual bridge under construction. The temporary bridge provided a safe driving surface for the crawler cranes, redi-mix trucks, and all ancillary vehicles. Once the construction was completed, the temporary bridge was dismantled...
These hand placed small Timber Stop Logs are being used in Ontario in a difficult to reach location through a manhole. They are light enough to manhandle into position without the use of a crane. The neoprene seal in the bottom of each stop...
These blocks are simple 6" x 6" x 24" full sawn Hemlock blocks. They will be used to block under heavy cement pre-stressed modules in preparation for installation at the Vancouver Airport.
These Timber Stop Logs are made from Douglas Fir Select Structural and come complete with neoprene seals and galvanized lifting ears. Each piece is 6" x 6" - 10' long. These seals are designed to reduce any leakage since these Stop Logs will be...
Our customer is rehabilitating a river drainage in North Vancouver. They have to walk a machine carefully up the middle of the river, staying off the bottom away from the sand and gravel. They achieved this by laying down Swamp Mats and carefully working...
Transition Mats - these are being used by a customer to "flatten" a landing zone for a Genie lift. The site is on a steep hill and this was the best value solution to keep the machine flat through many moves. We make interesting...
You have no products in your quote list or cart.