Regina’s Mosaic Stadium and Industrial Timber Product crane mats
Industrial Timber Product 4′ x 20′ crane mats were used extensively on the new Mosaic Stadium project completed by PCL Construction in late 2016. Crane mats were used on the outside perimeter of the stadium to achieve a good “base” for the large crawler cranes on site. The mats were then shifted to the inside of the stadium to lift the other heavy items into place. More info can be found here.